Resource Utilization Using PowerVC Based Auto-Provisioning

Authors

  • Pavan G Yajurvedi M. Tec h Part Time 6* semester Student, Computer Science & Engineering School of Computing & Information Technology REVA University, Bangalore, India
  • Vishwanath R. Hulipalled Deputy Director, School of Computing & Information Technology, REVA University, Bangalore, India

DOI:

https://doi.org/10.26438/ijcse/v9i5.5560

Keywords:

VMs, Mem, Proc, storage, PowerVC, HMC, LPAR, FSP

Abstract

AIX regression test suite execution will take place on every weekly build, and this requires one or more lpars with pre-defined configurations need to be dedicated per job( eg: for specific function/feature/area). and each lpar needs a NIM installation.This model has a limitation of most of the H/W remains unutilized till next execution starts (due to dedicated H/W per job) and reconfigurations to improve utilization involves admin efforts.To address this limitation, we are going with new approach where Lpar/VMs will be created with required config on demand when there is a requirement, and it will be recycled (Memory, CPU, and Disks) immediately once the work is done in automated way with the help of PowerVC.

References

[1] George Almasi, Jose G. Castanos, H. Franke, and M. A. L. Silva. 2016. Towardbuilding highly available and scalable OpenStack clouds. IBM J. of Res. and Devel.60 (2016).

[2] Marina Rodriguez Batalha, Raghavendra K Prasannakumar, and Hum-berto Tadashi Tsubamoto. 2016. Integrated Virtualization Manager for IBM PowerSystems Servers. An IBM Redbooks publication.

[3] Iain Campbell. [n. d.]. PowerVM Virtualization Essentials. Global KnowledgeTraining LLC White Papers. ([n. d.]). Oct. 2014. Accessed on 30 May 2017.

[4] Charlie Cler. 2015. HMC Architecture Options.IBM Systems Magazine(Feb. 2015).Accessed on 23 May 2017.

[5] Mel Cordero, Lucio Correia, Hai Lin, Vamshikrishna Thatikonda, Rodrigo Xavier,and Scott Vetter. 2013.IBM PowerVM Virtualization Introduction and Configuration.An IBM Redbooks publication.

[6] Sylvain Delabarre, Sorin Hanganu, and Thomas Libor. 2016.IBM Power SystemsHMC Implementation and Usage Guide. An IBM Redbooks publication.

[7] Jez Humble and Joanne Molesky. 2011. Why enterprises must adopt devops toenable continuous delivery.Cutter IT Journal24, 8 (2011), 6.

[8] IBM. [n. d.]. Adding the Virtual I/O Server installation files to the PowerVMNovaLink installer. IBM Knowledge Center. ([n. d.]). Apr. 2017. Accessed on 30 May 2017.

[9] IBM. [n. d.]. Installing PowerVM NovaLink. IBM Knowledge Center. ([n. d.]).Apr. 2017. Accessed on 30 May 2017.

[10] IBM. [n. d.]. Managing system management services. IBM Knowledge Center. ([n.d.]). ibm.com/support/knowledgecenter/POWER8/p8hb6/p8hb6_kickoff.htm,Feb. 2015. Accessed on 30 May 2017

Downloads

Published

2021-05-31
CITATION
DOI: 10.26438/ijcse/v9i5.5560
Published: 2021-05-31

How to Cite

[1]
P. G Yajurvedi and V. R. Hulipalled, “Resource Utilization Using PowerVC Based Auto-Provisioning”, Int. J. Comp. Sci. Eng., vol. 9, no. 5, pp. 55–60, May 2021.

Issue

Section

Research Article