An Innovative Approach for Risk Identification and Management in Software Projects

Authors

  • Joshy AP Department of Computer Science and Engineering, CHRIST (Deemed to be University), Bangalore
  • Natarajan K Department of Computer Science and Engineering, CHRIST (Deemed to be University), Bangalore
  • Pani AK Department of Computer Science and Engineering, CHRIST (Deemed to be University), Bangalore

DOI:

https://doi.org/10.26438/ijcse/v7i2.623630

Keywords:

software risks, risk management, risk classification, risk impact, risk identification, risk assessment, risk mitigation

Abstract

Risk is a potential issue that may trade off the achievement of a product advancement venture. The success of a project is altogether impacted by the risk management. The exactness of risk assessment specifically impacts the adequacy of risk management. In this paper, we examine the chance components. The Risk-matrix has been inspected and a checklist is made to perceive the significance of the risk .This paper deals with the risk factors identified with risk estimation ,risk analysis, venture board, risk scope, prerequisites and hazard factors identified with client fulfilment .Here we are adopting a method which consists of 2 phases. The first one is the risk identification and second is the risk management planning. Identification of the risk involves analytical methods like a risk checklist which evaluates the risk and risk assessment matrix. In risk checklist the probability of occurrences is taken and the possible negative effects for each risk is identified. Management of the risk involves various measures to be adopted to reduce the probability of risk events and to reduce the negative impacts of the risk events.

References

[1] Uzair Iqbal Janjua, Jafreezal Jaafar, Izzatdin B A Aziz, "Integration of supportive processes with elementary processes for making current practices of software project risk management more effective", Mathematical Sciences and Computing Research (iSMSC) International Symposium on, pp. 292-297, 2015

[2] Ignacio Marin-Garcia, Patricia Chavez-Burbano, Victor Guerra, Jose Rabadan, Rafael Perez-Jimenez, Hua Wang, "Considerations on Visible Light Communication security by applying the Risk Matrix methodology for risk assessment", PLOS ONE, vol. 12, pp. e0188759, 2017

[3] A. Nguyen-Duc, D. S. Cruzes, R. Conradi, "The impact of global dispersion on coordination team performance and software quality-a systematic literature review", Information and Software Technology, vol. 57, pp. 277-294, 2015

[4] Saad Yasser Chadli, Ali Idri, Trends and Advances in Information Systems and Technologies, vol. 746, pp. 408, 2018.

[5] M. Usman, F. Azam, N. Hashmi, "Analysing and reducing risk factor in 3-c`s model communication phase used in global software development", Information Science and Applications (ICISA) 2014 International Conference on, pp. 1-4, 2014.

[6] Hussein Hashimi, Alaaedin Hafez, Mutaz Beraka, "A Novel View of Risk Management in Software Development Life Cycle", Pervasive Systems Algorithms and Networks (ISPAN) 2012 12th International Symposium on, pp. 128-134, 2012.

[7] S. Y. Chadli, A. Idri, J. L. Fernndez-Alemn, J. N. Ros, "Frameworks for risk management in gsd projects: A survey", Intelligent Systems: Theories and Applications (SITA) 2015 10th International Conference on, pp. 1-6, Oct 2015.

[8] S. V. Shrivastava, U. Rathod, "Categorization of risk factors for distributed agile projects", Information and Software Technology, vol. 58, pp. 373-387, 2015.

[9] Zakari Tsiga, Michael Emes, Alan Smith, "Implementation of a risk management simulation tool", Procedia Computer Science, vol. 121, pp. 218, 2017

[10] S. Betz, S. Hickl, A. Oberweis, "Risk Management in Global Software Development Process Planning", 2011 3th EUROMICRO Conference on Software Engineering and Advance Application, pp. 357-361, August-September 2011

Downloads

Published

2019-02-28
CITATION
DOI: 10.26438/ijcse/v7i2.623630
Published: 2019-02-28

How to Cite

[1]
A. P. Joshy, K. Natarajan, and A. K. Pani, “An Innovative Approach for Risk Identification and Management in Software Projects”, Int. J. Comp. Sci. Eng., vol. 7, no. 2, pp. 623–630, Feb. 2019.