Singh, Jasjit, and Anil Kumar. 2025. “Analysis of Two Phase Scheduling Within Distributed System for Enhancement of Make Span and Flow Time”. International Journal of Computer Sciences and Engineering 6 (5):278-82. https://doi.org/10.26438/ijcse/v6i5.278282.